SCO-12-16 Installation and commissioning of tunnel-type carbon cylinder oxidation furnace

SCO-12-16 tunnel-type carbon cylinder oxidation furnace, which is mainly used for heating and oxidation of aircraft engine cylinder block heat shield, was successfully installed and commissioned and delivered to Changsha customer in May 2023. • The machine adopts tunnel horizontal conveying layout, the box is divided into feeding area, hot air drying area, discharging area, length 18000mm.

2023-07-25

Views:

FAQ about dongguan xinzhou & hubeixinhai

Q: Are you trading company or manufacture? A: We are both manufacture and trading company. We have over 15 years' professional experience as an industrial drying equipment manufacturer. Q: Do you provide OEM ODM service? A: Yes. We have our own R&D team to customize your machine plan. Q: How about the production capacity of your company? A: Our factory covers area about 15000M² and produces machines 1500+ sets per year. Q: How could we trust you and your company for the first transaction? A: Our company has more than 15 years professional experience. We cooperate with a lot of big customers, such Panasonic, Threebond, Hisilicon, HUAWAEI, etc. Welcome to our company and watch our plant production condition any time. Q: What kind of certificate do you have? A: CE&ISO Q: How long is your warranty? A: One year after the arrival of the goods. Q: What about your delivery time? A: Normally within 25 working days against down payment. Q: What about the package of your export product? A: We use standard export wooden case with foam inside. Q: Can we visit the factory? A: Yes, welcome. We have two factories, one is in Dongguan, Guangdong Province; The other is in Xiangyang, Hubei Province. Q: What’s your payment term? A: 30% advance payment and balance before shipping. Q: How long does it take to produce? A: Usually, it will takes about 45 days after received the advance payment. And the accurate schedule will be provided before production. Q: What about your after-sales service? A: Don’t worry. We provide online support. If you have any questions after received the goods, just feel free to contact with us. We will try our best to solve it for you.

2023-06-17

Views:

SCO-21L-2 chain reheating furnace

SCO-21L-2 chain shaped heating furnace, 1. Size of inlet and outlet of furnace body: W85mm* H205mm. 2. Heating section two-stage heating, temperature control and overtemperature control system two groups. 3. Double row extended pin chain + special tooling plate conveying, plus elastic tensioning device. The height of the upper surface from the ground: 998mm.

2023-07-25

Views:

HSCO-10-36 Guodian green hydrogen energy battery line

HSCO-10-36 Guoelectric green energy hydrogen energy battery line, used for fuel cell gas diffusion layer of microporous layer sintering at high temperature, 1100* 45,000 *800㎜ (width * length * height) divided into 9 sections splice, each section 5000mm,45 roller arch design (plant ceiling height 4.5 meters). It adopts the mode of air discharge under the carbon belt, the wind generated by the centrifugal wind wheel spreads from left to right, and the air suction in the middle.

2023-07-25

Views:

DIC EXPO 2023 China (Shanghai) International Display Technology and Application Innovation will be grand opening at Shanghai New International Expo Center on August 29-31, 2023

DIC EXPO 2023 China (Shanghai) International Display Technology and Application Innovation will be grand opening at Shanghai New International Expo Center on August 29-31, 2023. More than 20 professional forum activities will be held during the same period of the exhibition. More than 200 industry speakers will be invited to deliver keynote reports on the status quo and development trends of the most concerned policies, markets, technologies and products in the global display industry.

2023-08-23

Views:

Zhuhai Gree Group leaders visit Hubei Xinhai industrial factory inspection

Zhuhai Group has cooperated with Xinzhou Industry for more than ten years, but this is the first time to visit Xinhai Industry factory audit. This time, there are two leaders of Xinhai Industry in Hubei Province, who mainly visited the first sheet metal, welding and spraying workshops, and the assembly, dust-free and testing workshops of the second part. They verified the equipment and qualification of the factory and put forward their own valuable opinions. We hope that the two companies will have more projects to strengthen cooperation in the later stage!

2023-08-23

Views:

VCO-45-32-3D vertical hot air circulation dryer

VCO-45-32-3D vertical hot air circulation dryer, the machine is automatic in and out of the material, the product through the furnace after 60 minutes into the next process. Internal size: L4260mm*W1080mm*H1720mm(the conveying circulation mechanism in the furnace is divided into about 4 parts, 13 layers each, each layer is 100mm, a total of 52 layers.) Max:120℃, the common temperature is 120℃, and it takes about 30 minutes for the normal temperature to rise to 120℃.

2023-07-25

Views:

CSAM-7-36 PCB automatic aging tunnel

CSAM-7-36 PCB automatic aging tunnel was successfully delivered to Changsha customer for automatic aging test of circuit board after R&D, production, assembly and debugging by Hubei Xinhai Industry; The equipment is mainly divided into body chamber, heating system, cache mechanism, feeding mechanism, conveying mechanism, feeding mechanism, discharging mechanism, control system, monitoring system, scanning code system and so on.

2023-07-25

Views:

Delco Germany (Industrial Drying Equipment)

As a professional manufacturer of automobile sensors, Delco Germany purchased 10 pieces of drying equipment from us in 2008 for electronic sensor epoxy resin curing. And the drying equipment are still in normal operation. This year, this client needed to move the plant. Because the drying equipment is rather large, this client invited us onsite for overseeing transferring and installation.

2023-06-17

Views:

Panasonic Japan (Industrial Tunnel Ovens)

Panasonic Japan needed to purchase 3 industrial tunnel ovens in November of 2011. This client inspected several industrial tunnel oven suppliers for 3 months. Panasonic Japan mainly looked for capacity of design, manufacturing, service and trust. After 5 times discussion with clients about the design plan, the client finally accepted the design plan we provided. In this design plan, we advised to adopt infrared and hot air-drying methods. Then, we signed the contract finally.

2023-06-17