MOL series dust-free oven Clean oven Installation, use and maintenance tips
Published:
2024-09-13
MOL series dust-free oven Clean oven Installation, use and maintenance tips
1、 Installation location requirements:
1. A level and tidy floor is required;
2. Do not expose to flammable or corrosive gases;
3. Try to avoid direct sunlight and keep the ambient temperature below 40 ℃;
2、 Power installation requirements:
1. Connect the power according to the power specifications specified on the equipment nameplate;
2. The voltage fluctuation rate is within ± 5% of the rated value;
To avoid electric shock accidents, the machine itself must be grounded (according to the third grounding method of the electrician regulations, the grounding resistance should be below 100 Ω);
4. Do not connect the green grounding wire to gas or water pipes;
5. Do not share the grounding circuit between ovens with residual current circuit breakers and ovens without such devices.
3、 Operating requirements for dust-free ovens:
1. Nitrogen port: Before operation, nitrogen should be connected to the nitrogen port of the machine, and special attention must be paid to adjusting the N2 pressure to the appropriate flow rate before connection.
2. After placing the baked goods into the box, the storefront must be closed and the door latch must be securely fastened. The storefront safety switch must be activated before the machine can start smoothly.
3. The cooling exhaust outlet behind the oven should be connected to the exhaust system. If there is high temperature during cooling, the connecting pipe should be insulated to prevent burns or affect the working environment.
4、 Daily maintenance and methods:
1. Observe whether the pressure difference of the differential pressure gauge is within the normal range;
2. Check whether there is dust blockage in the high-efficiency filtration of the circulating air outlet, which can be determined from the value of the differential pressure gauge;
3. If the high-efficiency filtration of the air outlet is clogged with dust, it needs to be replaced in a timely manner to avoid blocking the air duct and affecting the uniformity;
4. Clean the inside of the box after baking every day, and be careful not to use dangerous cleaning agents such as alcohol to avoid explosions;
5. The repairman checks whether the current is normal and whether the fan is running normally;
6. Check if the thermostat is accurate. If not, adjust the static compensation or sensor correction value of the thermostat;
7. Check whether the heating tube is damaged and whether the circuit is aging;
8. Check whether the delay device is accurate and whether the error is allowed.

Latest News
Hubei Xinhai Industrial Intelligent Equipment Co., Ltd. Factory Relocation Good News
Hubei Xinhai Industrial Intelligent Equipment Co., Ltd. started its relocation to a new location on March 26, 2024, located on Songyu Fourth Road, Yicheng Economic Development Zone, Xiangyang City, Hubei Province. The unveiling ceremony was held on April 26, 2024, and production has basically returned to normal. The relocation celebration will be held on May 18, 2024. Friends are welcome to attend!
2024-09-13
SCO-12-16 Installation and commissioning of tunnel-type carbon cylinder oxidation furnace
SCO-12-16 tunnel-type carbon cylinder oxidation furnace, which is mainly used for heating and oxidation of aircraft engine cylinder block heat shield, was successfully installed and commissioned and delivered to Changsha customer in May 2023. • The machine adopts tunnel horizontal conveying layout, the box is divided into feeding area, hot air drying area, discharging area, length 18000mm.
2023-07-25
FAQ about dongguan xinzhou & hubeixinhai
Q: Are you trading company or manufacture? A: We are both manufacture and trading company. We have over 15 years' professional experience as an industrial drying equipment manufacturer. Q: Do you provide OEM ODM service? A: Yes. We have our own R&D team to customize your machine plan. Q: How about the production capacity of your company? A: Our factory covers area about 15000M² and produces machines 1500+ sets per year. Q: How could we trust you and your company for the first transaction? A: Our company has more than 15 years professional experience. We cooperate with a lot of big customers, such Panasonic, Threebond, Hisilicon, HUAWAEI, etc. Welcome to our company and watch our plant production condition any time. Q: What kind of certificate do you have? A: CE&ISO Q: How long is your warranty? A: One year after the arrival of the goods. Q: What about your delivery time? A: Normally within 25 working days against down payment. Q: What about the package of your export product? A: We use standard export wooden case with foam inside. Q: Can we visit the factory? A: Yes, welcome. We have two factories, one is in Dongguan, Guangdong Province; The other is in Xiangyang, Hubei Province. Q: What’s your payment term? A: 30% advance payment and balance before shipping. Q: How long does it take to produce? A: Usually, it will takes about 45 days after received the advance payment. And the accurate schedule will be provided before production. Q: What about your after-sales service? A: Don’t worry. We provide online support. If you have any questions after received the goods, just feel free to contact with us. We will try our best to solve it for you.
2023-06-17